Supplied uninterrupted power on demand 24 hours 7 days a week since the commissioning until the end of the EPP contract in March 2004 to the National Electric Power Authority (NEPA) of Nigeria to serve a dedicated distribution network within Abuja and its environs.
Geometric Power & Renatech, as the sole manager of every facet of the project, was able to complete installation of this first indigenously owned and independently operated power station in a record time.
Geometric Power Limited has therefore proven that it is possible to build and sustain a privately owned electric power company in Nigeria.